Hi Gian
If I execute MB51 report, there were two lines printed for the same material document for 641 movement.
Line item 1 MATDOC 1 BATCH SLOC 641 movement Issue plant
Line item 2 MATDOC 1 641 movement Receiving plant
The exact issue is that the batch and SLOC were not updated in the material doc display in MIGO.
The details available in source plant and it is blank in destination plant,
Regards
Chandru