In the work order, under control tab, please check the costing variant.
Go to t-code OKP6, check the details of costing variant (assigned in order)
click on valuation variant, go to overhead tab and check the costing sheet assigned there.
You can contact your CO consultant, if you have any confusion.
Regards
Pavan